Athough we suffered damage from Irene, which a lot luckier than most in the county. It primarily affected the library and the master bedroom. The ceiling and insulation had to be replaced in the library, but we ran with the damage in the master bedroom and decided to vault the ceiling, create a mediation loft and add a closet. It took almost a year for the work in the master bedroom to be completed, but here are some pics of the damage. Int he meanwhile the house was totally diplaced, with all of the belongings from other rooms moving into the front and back parlors, blue bedroom and hallway. For a few months the only livable room was the blue bedroom, and that was crammed with stuff!
Library Ceiling Soaked, all insulation and wood covered in mold
Master Bedroom all ripped up :(
Looking up into the attic
Looking down into the master bedroom
Roof peeled back
Library stuff in back parlor
Master Bedroom Stuff in Front Parlor
Blue bedroom filled
Middle Bedroom stuff in hallway - what a mess!
After the sheetrocker replaced the ceiling in the library, he left spackle globs all over the refinished floor. Grrrr!
New Sheet rock in the hallway
No comments:
Post a Comment